PROJECTS | A Helium Project From Start to Finish

February 1, 2018

 

A recent project for my clients in Didsbury. They had purchased the property early on in 2017 & had inherited the existing kitchen with the house. 

 

 

THE ISSUES

Aside from the dated style of the cabinets my clients biggest issue was worktop space. The small section on the right there is all they had. A freestanding fridge & the gas hob broke this up even further making day to day life difficult for them & their son.

 

THE DESIGN

Helium created a fresh new layout that incorporates the modern styling of our lacquered gloss kitchen. By relocating the fridge to the left of the range along with a pull out pantry, I was able to provide my clients with the most worktop space possible. The built in microwave & the addition of a Quooker boiling water tap are both super practical & most importantly in this project, space saving. Bye bye kettle.

 

Removing the tired, built in larders & replacing them with extra deep wall units gives a more open feel to the space & provides tonnes of storage for the family of 3.

 

2 large sets of pan drawers, including wooden cutlery tray & anti slip mats, brings practicality & lots of storage for pots, pans, plates, cutlery & utensils.

 

A built in bin now provides a tidy waste solution that allows an easier way to prepare the recycling.

 

A built in towel rail provides a home for the hand towel & tea towel so they don't have to be hung on the range cooker handles.

 

DESIGN SCHEME

KItchen Range: Laquered Gloss

Colour 1: Dust grey (base & tall units)

Colour 2: Dove grey (wall units)

Worktops: 30mm Silestone Quartz "White Storm"

Features: Quooker boiling tap, pull out larder, le mans corner unit, full height drawer sides, under cabinet lighting.

 

 

DAY 1 - Monday November 27th

Goodbye dated kitchen.

 

DAY 2

By day 2 everything has been removed including the tiled floor. 

 

Day 7 - Monday December 4th

The new kitchen was delivered & put into place. On checking the delivery, we realised that some of the items had been sent in the incorrect colour. Replacements were arrange & delivered by the end of the week causing no delays to the installation.

 

Day 10

All the cabinets are secured into place by now & the stone worktops can be templated.

 

DAY 14

The tiles were laid.

 

DAY 19

The quartz worktops were fitted

 

The final days

Included connecting the sinks & Quooker tap & touching up the decorating.

 

 

Generally, this was a 3 week project including all the preparation work, kitchen installation & the fabrication & installation of the quartz worktops. Which left my client with a beautiful new kitchen just in time for Christmas. The only that could not be fabricated within this time was the mirrored splashbacks for the chimney breast due to the Christmas closures. These were fitted early on in the new year to complete the installation fully.

 

If you'd like more information on working with Helium or you'd like to discuss an upcoming project, please get in touch with us via our CONTACT page.

 

 

See you next time,

Francesca

 

If you enjoyed this post & found it helpful, let me know by hitting the heart below or leaving me a comment.

 

 

JOIN THE DISCUSSION

 

​​​​​​​Do you want to connect with other people who are undertaking kitchen projects too? Head over to the THE KITCHEN DESIGN GROUP on Facebook for ideas, inspiration, discussions, reviews & also tips & advice on renovating/building your dream kitchen. Anyone can join & get involved so be sure to add friends & family who may be interested too!

 

 

 

 

Share on Facebook
Share on Twitter
Please reload

Featured Posts

NEW PRODUCTS for 2019

April 2, 2019

1/5
Please reload

Recent Posts
Please reload

Follow Us
  • Instagram Social Icon
  • Black Facebook Icon
  • Black Pinterest Icon
  • Black Twitter Icon
Please reload